ITW Office Warehouse Development

Client: Auckland
Timeframe: Completed February 2013
Total value: $3.5M

Project description:

Auckland International Airport agreed to the development of the new ITW New Zealand head office.

The development included a 2,300m2 warehouse with a single storey 224m2 office and 1,300m2 yard. This is covered by a 200m2 canopy.

The site is a long slender piece of land that needed to not only make transit of large trucks possible, but also take into consideration the potential for future expansion of the neighbouring property. The landscaping and exterior aesthetic of the building is of the utmost importance to AIAL and this project did not disappoint.

Our role

Xigo were engaged as Project Manager and Engineer to the Contract for the design, procurement and construction of the development. The project involved an integrated design of the base build and tenant fit out components for both the office and warehouse. Both AIAL and ITW engaged Xigo as the project managers for their respective works on the project and the construction was run under one all-encompassing contract.

Substantial value engineering was carried out during the design phases to ensure we went to tender below budget, this resulted in the development being successfully completed in February 2015. This was on time and under budget for both the base building works and fit out works.